top of page

Studio Construction: Meanwhile, Back at the Studio

Jun 22, 2015

1 min read

0

0

0

Custom alt text

While I was away in New Zealand, a lot happened on the home front.

The cut flower bed burst into bloom.

Custom alt text

It is hard to see, but the downspouts were made then put in place.

Custom alt text

Ron sealed the porch concrete.

Custom alt text

Dave finished off the porch soffit.

Custom alt text

It is all looking good outside.

Custom alt text

Ron is pointing out to me where different parts of the built-in cabinetry will go. The designer and carpenter visited and marked the cabinet layout on the floor.  This is the only built-in cabinetry and it has to be because this is where the plumbing comes and goes.

Jun 22, 2015

1 min read

0

0

0

Comments

Share Your ThoughtsBe the first to write a comment.

Thank you for exploring Lesley Turner Art

bottom of page