The crawlspace floor has set. Here I am trying it out, standing directly below where my irons will be set up.
Other activities continued over the week.
Henry, a water and airproof sticky membrane, was stuck to the outside of the concrete foundation around the back of the building.
All of the formwork timber had nails pulled out then was stacked up ready to be used again on another job site.
Early one misty morning a slinger truck arrived on site.
A wet gravel mix was slung behind the building.
It was used to support and cover the building's perimeter drains. It will keep any water draining away from the building to keep the foundation dry.
We have had a wet week, but the work continues.