top of page

Studio Construction: Meanwhile Back at the Studio

Jun 5, 2015

1 min read

0

0

0

Custom alt text

Dave has started framing up for the outside stair footings.

Custom alt text

He said it was lucky he didn't make the framing any smaller because he woudn't have been able to fit inside.

Custom alt text

I try out what it is like to have power in the studio.

Custom alt text

The tapers are back adding another layer of mud and sanding it back.

Custom alt text

Tapers' tool belts hold their own specialised tools.

Custom alt text

And they wear stilts. I have been looking out the window on and off all day hoping to catch either Cameron or Jordon wearing their stilts.

Custom alt text

Light fixtures have been installed in the crawlspace. Code requires the fixtures dangle and not be fixed to the ceiling. This is so the bulb will move and not break if accidentally walked into.

Jun 5, 2015

1 min read

0

0

0

Comments

Share Your ThoughtsBe the first to write a comment.

Thank you for exploring Lesley Turner Art

bottom of page