top of page

Studio Construction: Services and Backfilling

May 8, 2015

1 min read

0

0

0

Custom alt text

Oohh! A new van. The plumber.

Custom alt text

The house water main now has a new line going off it - to the studio.

Custom alt text

The white line takes water to the studio.

The electrician has laid the first of the power and services conduit coming out of the studio crawl space. He puts zip lock bags over the ends to keep the soil out.

Custom alt text

This is the water pipe coming out of the building from the wash tubs and feeds into the nearby septic tank.

Custom alt text

Once all of the crews had gone for the day, Ron and I backfilled the trenches near the studio building. We wanted to cover the exposed tree roots as soon as possible before they dried out.

May 8, 2015

1 min read

0

0

0

Comments

Share Your ThoughtsBe the first to write a comment.

Thank you for exploring Lesley Turner Art

bottom of page