top of page

Studio Construction: Services and Backfilling
May 8, 2015
1 min read
0
0
0
Oohh! A new van. The plumber.
The house water main now has a new line going off it - to the studio.
The white line takes water to the studio.
The electrician has laid the first of the power and services conduit coming out of the studio crawl space. He puts zip lock bags over the ends to keep the soil out.
This is the water pipe coming out of the building from the wash tubs and feeds into the nearby septic tank.
Once all of the crews had gone for the day, Ron and I backfilled the trenches near the studio building. We wanted to cover the exposed tree roots as soon as possible before they dried out.
Related Posts
Comments
Share Your ThoughtsBe the first to write a comment.
bottom of page