top of page

Studio Construction: Time For a Site Clean up

Jun 10, 2015

1 min read

0

0

0

Custom alt text

Ron and I spent the day cleaning up the construction site.

Manufactured wood and concrete board went into the skip. Anything made with treated timber or glues we don't want to burn in the fireplace.

Custom alt text

The cladding off cuts went into a recycling pile.

Custom alt text

I stacked all of the shorter boards that can be used as firewood mostly as is.

Custom alt text

Ron pulled out nails and stacked the longer boards that need to cut into shorter lengths for the fireplace.

Custom alt text

I spend several hours once again vacuuming up construction dust. This time is was plaster dust. I needed a shower after I had finished.

Now the site is much tidier.

Jun 10, 2015

1 min read

0

0

0

Comments

Share Your ThoughtsBe the first to write a comment.
bottom of page