top of page

Studio Construction: Work Continues Inside and Outside

  • ravenmade
  • May 7, 2015
  • 1 min read
Custom alt text

After the first day of securing the drywall panels in place. The ceiling is done.

Custom alt text

Ron and Dave check the work.

Custom alt text

Dave has been lining the crawlspace with plywood. His assistant, Paul, sweeps up after a day's work.

Custom alt text

We are really pleased with the way this area is looking.

Custom alt text

Dave has also put in place the formwork for the porch floor.

Custom alt text

A small load of gravel was dropped off and leveled out. Dave attached rebar rods to the wall and extended them out into the floor area. He added a wire mesh and a rebar grid - all so the concrete would be well supported.

The taped brown paper is to protect the wall from splashes when the concrete is poured.

 
 
 

Recent Posts

See All

Comments


Thank you for exploring Lesley Turner Art

bottom of page